人造草坪施工步骤

发布日期:2018/8/14 9:48:05 选择字号:

人造草坪施工具体步骤如下: 
The specific steps of artificial turf construction are as follows:
 
1、涂胶粘合:要求用刷子在其草坪底部涂刷薄厚均匀,不可反复涂胶,否则造成起泡现象,严格控制胶水的厚度,注意涂胶速度要适当,分别涂于被粘接的两粘接面上。根据当时的温度、湿度等条件合理控制晾置时间,一般以涂胶好10-15分钟为宜。切不可在粘合后来回移动被粘接的物体。 
1. Adhesive application: it is required to use the brush to apply thin and thick evenly on the bottom of the lawn, and do not repeat the application of glue, otherwise it will cause foaming phenomenon. The thickness of the glue should be strictly controlled. According to the temperature, humidity and other conditions at that time reasonable control of the setting time, generally good adhesive 10-15 minutes as appropriate. Must not move the bound object back later in the bond.

2、加压固化:粘合后用专用的橡皮锤从粘接处向两边用力锤实,使其表面充分粘接密实更牢固。其固化时间一般为三天,检测强度一般为十天。因此在固化期间需密切注意对其维护,避免过于爆晒、沾水和移动。
2. Pressure curing: after bonding, use special rubber hammer to hammer both sides from the joint, making its surface fully bonded and compacted more firmly. The curing time is generally three days, and the testing strength is usually ten days. Therefore, it is necessary to pay close attention to the maintenance during curing to avoid over-exposure to the sun, water and moving.

3、裁切休整:人造草坪粘接后在未充石英沙和橡胶粒之前对场地裁切的碎片进行清洁处理。
3. Cut and rest: after the artificial lawn is glued, clean the debris of the site before filling with quartz sand and rubber particles.

4、铺装石英砂:人造草坪粘贴休整好后,需要再草丝内用专用石英沙固定草丝,使草丝不倒伏,灌沙到草丝剩余高度10mm以内,在草丝表面铺撒橡胶颗粒,铺撒要均匀。
4. Paving quartz sand: after the artificial turf is pasted and recuperated, it is necessary to fix the grass silk with the special quartz sand inside the grass silk so that the grass silk does not fall over. Sand is poured to the remaining height of the grass silk less than 10mm.

5、检查验收:经过以上几步、人造草坪铺设过程基本完毕,需要对人造草坪整体进行检查验收,如发现问题应及时报告修正。运动场休闲人造草坪材料就找运之家。
5. Inspection and acceptance: after the above steps and the laying process of artificial turf is basically completed, it is necessary to check and accept the whole artificial lawn. If any problem is found, it should be reported and corrected in time.
 